Home Blogs PM Surya Ghar Subsidy Guide
GOVERNMENT SCHEMES & SUBSIDIES

Complete Guide to PM Surya Ghar Muft Bijli Yojana Subsidy (Up to ₹78,000)

Published: March 10, 2026 Author: Solar Subsidy Advisory Team 6 min read
PM Surya Ghar Muft Bijli Yojana Rooftop Solar Scheme

The PM Surya Ghar: Muft Bijli Yojana launched by the Government of India provides unprecedented financial subsidies for homeowners installing rooftop solar systems. If you reside in Maharashtra and receive an electricity bill from MSEDCL (Mahavitaran), you can claim up to ₹78,000 as a direct bank transfer (DBT) subsidy.

Understanding the Subsidy Structure (Capacity Wise)

The central financial assistance (CFA) under PM Surya Ghar Yojana is directly linked to the registered capacity of your rooftop solar plant. Here is the official subsidy breakdown:

System Capacity Central Subsidy (CFA) Approx. Daily Generation Monthly Bill Reduction
1 kW System ₹30,000 4 – 5 Units ₹800 – ₹1,200
2 kW System ₹60,000 8 – 10 Units ₹1,800 – ₹2,400
3 kW or Higher ₹78,000 (Maximum) 12 – 15+ Units ₹3,000 – ₹4,500+
Group Housing / Societies ₹18,000 per kW (up to 500 kW) Common area loads Substantial community savings

Important Eligibility Requirement

To qualify for the government subsidy, the system must utilize DCR (Domestic Content Requirement) solar PV modules manufactured in India with ALMM (Approved List of Models and Manufacturers) certification. At Proud Indian Solar System, all residential installations adhere strictly to MNRE and DISCOM compliance guidelines.

Documents Required for Subsidy Application

  • Latest MSEDCL electricity bill (consumer number must match property name).
  • Aadhaar card of the electricity connection owner.
  • Bank account passbook or cancelled cheque (for direct subsidy transfer).
  • Clear rooftop photographs showing available shadow-free space.
  • Property ownership document or municipal tax receipt.

Step-by-Step Installation & Subsidy Disbursement Journey

  1. Rooftop Survey & Technical Feasibility: Our solar engineers assess your roof orientation, shadow trajectory, and electrical load capacity in Chhatrapati Sambhajinagar or surrounding districts.
  2. National Portal Registration: Registration on the official National Portal for Rooftop Solar (pmsuryaghar.gov.in) and selection of Proud Indian Solar System as your registered vendor.
  3. MSEDCL Net-Metering Approval: Feasibility approval from the local DISCOM office.
  4. Installation of High-Efficiency DCR Panels: Installation of galvanized structure, Tier-1 solar modules, and on-grid inverter.
  5. Bi-Directional Net-Meter Installation: MSEDCL inspection and commissioning of the bi-directional meter.
  6. Direct Subsidy Credit: Within 30 working days of commissioning, the ₹78,000 subsidy is credited directly to the beneficiary's bank account.

Why Choose Proud Indian Solar System for Your Subsidy Application?

Navigating DISCOM approvals and government paperwork can be time-consuming. We handle the entire end-to-end process on your behalf:

  • Zero-hassle portal documentation and DISCOM liaisoning.
  • Premium Tier-1 mono-PERC and TOPCon bifacial modules with 25-year performance warranties.
  • Heavy-duty hot-dip galvanized mounting structures engineered to withstand 150 km/h winds.
  • Prompt local customer support and preventative maintenance across Maharashtra.

Explore our On-Grid Solar Systems, view our completed installations in the Projects Showcase, or learn about our Solar Panel Cleaning & Maintenance Guide.

CLAIM YOUR ₹78,000 SUBSIDY TODAY

Check Your PM Surya Ghar Yojana Eligibility

Send us your current electricity bill on WhatsApp. Our solar subsidy specialists will verify your eligible subsidy amount and calculate your net system cost instantly.

Proud Indian Solar Advisory Team
Government Subsidy & DISCOM Liaison Specialists
Back to All Articles
CALL NOW GET A FREE QUOTE